Home > Assets > CS Fu Hai

CS Fu Hai

print

Fu Hai has been specifically designed to meet the increasing requirements for positioning and burial capability in the submarine cable installation market. She is able to carry up to 5700 tonnes of cable, has a bollard pull of up to 110 tonnes, and is capable of deploying the latest generation of sub-sea ploughs.

Fu Hai is owned by S. B. Submarine Systems Co. Ltd., and bases in Shanghai, China. Since her delivered in November 2000, SC Fu Hai has carried out extensive lay and burial work on APCN2, CHINA-US Rerouting, C2C cable systems and SMW4 cable system etc.

Fu Hai can be utilized to carry out power cable installation. She is also able to support a variety of marine activities for the offshore oil & gas market.

Classification: DNV +1A1 E0 DYNPOS-AUTRNAV-O DK(+) TMON
Registered: Panama Flag: Panama

Principle Dimensions and Performance
Length overall 105.8m
Breadth 20.0m
Draft fully loaded 9.1m
Gross tonnage 6,303
Net tonnage 1,891
Maximum bollard pull 110 tonnes
Service Speed and Fuel Consumption 12.5 knots @ 31 tonnes / day
Endurance 45 days
Capacity of Main Cable Tanks 2,736 cu meters
Overall Cable Load Capacity 5,700 tonnes
Vessel Machinery and Equipment
DP control Kongsberg SDP21
Reference systems Three DGPS inputs
One Kongsberg Hipap
One Tautwire
Independent joystick control
Propulsion Two MAN/B&W total power 10,440 BHP direct driven CPP
Thrusters Bow – one 1369 BHP, retractable azimuth, one 1600 BHP tunnel thruster
Stern - Two 1600 BHP tunnel thrusters
Electrical power Two 3000 kW shaft generators
Two 700 kW auxiliary generators
One 150 kW emergency generator
Deck equipment One 60 tonnes SWL A- frame
One 60 tonnes tow winch
One 45 tonnes auxiliary winch
Three knuckle bow cranes Fwd – 2.5 tonnes/20m
Midships – 2.5 tonnes/20m
Aft – 2.0 tonnes/22m
Cable Equipment and Machinery:
Repeater Stowage Air conditioned, stowage and handling for 50 in-line jointed repeaters
Jointing & Testing Air conditioned, fully serviced and equipped space for UJ and proprietary jointing. Air conditioned, fully serviced and monitored space to accommodate system specific transmission testing equipment. Fitted with termination, power feed, DC and OTDR equipment.
Cable Handling Machinery 1 x 20 tonnes linear cable engine (20 wheel pair)
1 x 25 tonnes 4m cable drum engine
4 pair draw off / hold back cable engine (DOHB)
3 off 2 pair electrically driven transporters
Others:
Helideck Helideck suitable and classed for all helicopter types
Accommodation Fully funished and classed for a maximum of 68 persons
Officer and crew compliment during installation operations is nominally 51 persons
Navigational aids Radar (3cm), Radar (10cm)
2 x GPS, 3 x gyro Compassses
VHF Direction Finder, Navtex, Weather Fax
Communications Inmarsat B, Inmarsat B fax
GMDSS A1, A2, A3, Satcom C
MF/HF, Portable VHF, VHF aircraft Radio 
Call sign 3EGX3
IMO number 9207065